The Flooring Expert

Automatic Laser Welding Equipment For Stator

Short Description:

Short description:For laser welding of motor stator of new energy vehiclelead time and time: 16 weeks (the specific time is mainly based on the contract)


Product Detail

Product Tags

For laser welding of motor stator of new energy vehicle

Description

For laser welding of motor stator of new energy vehicle

● Automatic conveying module

● Robot automatic gripping module

● Servo pressurized height measuring station

● Robot transfer module

● Multi-station turntable module

● Electrical control system

Tech Specs

After the stator is fed from the high-speed punch, it contains a set of automatic conveying module, robot automatic grabbing module, servo pressure height measuring station, robot transfer module, multi station turntable module, and a set of electrical control system. Except for manual feeding, other actions are completed automatically.

Advantages

Compared with the traditional argon arc welding, welding speed, high precision, small post-welding deformation, beautiful appearance, the weld does not require subsequent processing (such as turning, grinding, etc.)

Product Video

FAQ

Q: acceptance methods and standards?

A: after the equipment is delivered, our technical personnel will go to the customer’s site for open box acceptance / installation and commissioning / equipment operation verification / training. Both parties will conduct equipment acceptance together, and finally sort out relevant acceptance data. After the training is completed, both parties will sign the final acceptance report

User Evaluation

In batch production, the welding quality meets the requirements

Product Show


  • Previous:
  • Next:

  • Write your message here and send it to us