This product is widerly used in the interior wall decoration and protection of villas, hotels, hospitals, schools, office buildings and homes.
Main ingredients: water, pigments, fillers, emulsion and auxiliaries.
Super Healthy, Super Caring
3TREES Health+ water-based coating standard
China Environmental Labelling certifications
UL GREENGUARD Gold certification
French Indoor Air Emissions A+ Certification
China Environmental Labeling Product Certification
Efficient odor removal
No additives
Outstanding Features, Superior Performance
Anti-formaldehyde, and can effectively purify free formaldehyde in indoor air
Full Function, Better Effect
Excellent hiding power
Scrub-resistance
Strong alkali resistance
Efficient mold proofness
Fine coating film
Lasting brightness
Easy application
Adjustable coloring
Application instructions: The surface must be clean, dry, neutral, flat, and free of floating ash, oil stains and foreign matters. Water-leaking parts must undergo waterproof treatment, and the surface should be polished before coating to ensure that the precoated substrate has a surface humidity of less than 10% and a pH value of less than 10. The paint effect depends on the smoothness of the substrate.
Application conditions: Wall temperature ≥ 5℃, humidity ≤ 85%, and good ventilation.
Application method: brush coating, roller coating, and spraying.
Dilution ratio: Dilute with clean water, and the recommended dilution ratio is not more than 20% (weight ratio).
Theoretical paint consumption: 12-14 ㎡/L/round (for a paint film of 30μm. Actual consumption may be slightly different due to different substrate roughness and porosity).
Recoating time: Surface drying 30-60 minutes, recoating interval 2-3 hours (which may be duly extended under low-temperature and high-humidity conditions).
Maintenance time: 7 days / 25℃, which may be duly extended under low-temperature, high-humidity conditions to obtain a solid film effect. In the process of paint film maintenance and daily use, it is suggested that doors and windows should be closed for dehumidification in high humidity weather (such as Wet Spring and Plum Rain).
Substrate treatment:
New wall: Thoroughly remove surface dust, oil stains and loose plaster, and repair any holes to ensure that the wall is clean, dry and smooth.
Re-painting wall: Thoroughly remove the original paint film and putty layer, clean surface dust, and level, polish, clean and thoroughly dry the surface, so as to avoid problems left over from the old wall (odor, mildew, etc.) affecting the application effect.
*Before coating, the substrate should be checked; coating can only start after the substrate passes acceptance inspection.
Coating system:
For best effect, please use this product together with 3TREES primer.
Substrate treatment (3TREES substrate treatment product series) – primer (3TREES Beautiful Life Odorless Anti-fungal Primer, one round) – topcoat (3TREES Beautiful Life Wall Paint, two rounds)
Tool cleaning: After or between applications, please clean the tool with clear water in time to prolong its service life.
Note: no additives: no artificial addition of formaldehyde and benzene substances. Colored products do not fall within the scope of "no additives".
This product should be sealed and stored at 0-40℃ in a cool and dry place and away from exposure to the sun. Refer to the product label for production date, batch number and storage life.
For more information, please refer to the product safety label.
Since its establishment, our factory has been developing first world class products with adhering the principle
of quality first. Our products have gained excellent reputation in the industry and valuabletrusty among new and old customers..