The Flooring Expert

China Shotcrete special used in the tunnel and bridge.

Short Description:

China Shotcrete special used in the tunnel and bridge.This product is made of aluminum oxide clinker, reinforcing agent and viscosifier. Its characteristics are less construction dust, low rebound rate and low strength loss in the later period. It can effectively improve the impermeability and impermeability of sprayed.AppearanceGray Powder / Light Yellow LiquidOther Name:Flash Setting AdmixtureModelFJ-3TypePolycarboxylate BasedFineness… FOB QINGDAO ,TIANJING ,SHANGHAI SEA PORT CHINA : US $400-1000/ Ton Min.Order Quantity: 1ton Supply Ability: 2000ton per Month Payment term : LC,TT shortcrete admixtures supplier: shortcrete admixtures manufacture


Product Detail

Product Tags

China Shotcrete special used in the tunnel and bridge.

 

This product is made of aluminum oxide clinker, reinforcing agent and viscosifier. Its characteristics are less construction dust, low rebound rate and low strength loss in the later period. It can effectively improve the impermeability and impermeability of sprayed.

Appearance
Gray Powder / Light Yellow Liquid
Other Name:
Flash Setting Admixture
Model
FJ-3
Type
Polycarboxylate Based
Fineness
< 5%
Proportion
1.36±0.02
PH Value
6-8
Used
Ready Mix Concrete, Construction Material
Certified
SGS
Packing Details
As power: 25kg/bag

As Liquid:
A.1000kg IBC tank, 18-20 drums /20′FCL, Total 20mt/20′FCL.
B. Flexitank can load 20mt.
C. 200kg/plastic drum, 78-80drums/20′FCL,Total 20mt/20′FCL.

Concrete Mechanical Properties

Item
Index
Setting Time (min)
Initial Setting Time
≤ 3
Final Setting Time
≤ 10
1 Day Compressive Strength (MPa)
> 8
28 Days Compressive Strength Rate (%)
> 80
Corrosion of Steel Reinforcement
No Steel Corrosion
 src=
 src=

Usage and Notes

1. Under the total weight of cement, liquid dosage is 2-4.5%, and powder dosage is 4-8%. The optimum dosage should be determined by test before use. The dosage should be adjusted according to the temperature during construction. For example, appropriately increase the dosage when temperature is low, reduce the dosage when temperature is high. 

2. Strictly control the water-cement ratio, the appropriate eructation should has no flow, no dry spots, and uniform color. 

3. The mixture stand-by time should be controlled when the concrete is sprayed. 

4. Pay attention to wet maintenance, to prevent dry crack after molding. 

5. Refers to relevant provisions of construction of the national standard “concrete admixtures application technical specifications”.


  • Previous:
  • Next:

  • Write your message here and send it to us