Double Bolt Clamps

Short Description:

1. Inner surface has dual gripping ridges2. Bolts lugs are reinforced to prevent bending out of alignment3. Measure hose OD accurately before ordering clamps4. Torque values for clamps are based on dry bolts. The use of lubricant on bolts will adversely affect clamp performanceDouble Bolt clamps size list as below:


Product Detail

Product Tags

Details

1. Inner surface has dual gripping ridges

2. Bolts lugs are reinforced to prevent bending out of alignment

3. Measure hose OD accurately before ordering clamps

4. Torque values for clamps are based on dry bolts. The use of lubricant on bolts will adversely affect clamp performance

Double Bolt clamps size list as below:

Name code size rang size Note Colour
double bolt clamp DB SL-22 20-22mm Without saddles Yellow
double bolt clamp DB SL-29 22-29mm
double bolt clamp DB SL-34 29-34mm
double bolt clamp DB SL-40 34-40mm
double bolt clamp DB SL-49 40-49mm
double bolt clamp DB SL-60 49-60mm Carbon steel saddles
double bolt clamp DB SL-76 60-76mm
double bolt clamp DB SL-94 76-94mm
double bolt clamp DB SL-115 94-115mm
double bolt clamp DB SL-400 90-100mm
double bolt clamp DB SL-525 100-125mm Malleable iron saddles White
double bolt clamp DB SL-550 125-150mm
double bolt clamp DB SL-675 150-175mm
double bolt clamp DB SL-769 175-200mm
double bolt clamp DB SL-818 200-225mm
double bolt clamp DB SL-988 225-250mm
double bolt clamp DB SL-1125 250-300mm
double bolt clamp DB SL-1275 300-350mm

6.instruction for double bolt clamps Firstly, check the pipe end surface and assure that the pipe is smooth, then aligning two piece of clamps and insert the bolt and connect them, finally hand tighten nuts make sure oval next bolt completely fits into bolt hole. Please make sure you use a wrench.

7.MILL TEST REPORT

Description: Double bolt clamps

Description

Chemical Properties

Physical Properties

Lot No.

C

Si

Mn

P

S

Tensile Strength

Elongation

ALL PALLET

2.76

1.65

0.55

LESS THAN 0.07

LESS THAN 0.15

300 Mpa

6%

8. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


  • Previous:
  • Next:

  • Write your message here and send it to us