By adopting “primer-topcoat-in-one” technology, the High Performance One Coat Wall Paint effectively integrates the functions of both primer and topcoat to realize more efficient application, faster move-in and more lasting wall effect. Efficient and odorless, the product features multiple controls on formula, production and quality management. Free of harmful substances such as formaldehyde, benzene, VOC, heavy metals and APEO, it can create a clean and healthy home environment for you. The product has passed UL GREENGUARD Gold Certification, French Indoor Air Emissions A+ Certification and China Green Product Certification. It meets the more stringent Health+ Water-Based Coating Standard, and can provide better home protection.
Main ingredients: Water, pigment, filler, emulsion and auxiliaries.
Super Healthy, Super Caring
3TREES Health+ Water-Based Coating Standard
UL GREENGUARD Gold Certification
French Indoor Air Emissions A+ Certification
China Environmental Labelling Product Certification
Highly efficient, odorless
Free of seven additives
Outstanding Functions and Better Quality Performance
Primer and topcoat in one, efficient application, faster move-in and better life right at your footstep
Ready-to-use pulp, convenient and standardized application, and better effect assurance
One-Package Solution to Wall Problems
High scrub resistance
Excellent hiding power
Strong resistance to alkali
Can be made into light colors
Doubled anti-mold effect
Efficient filtration
Endurable brightness
Easier application
Free from 7 additives: No added VOC, formaldehyde, benzene substances (benzene, toluene, xylene, and ethylbenzene), excessive heavy metal pigments and fillers, APEO, ethylene glycol ether and ether ester, or PAEs.
Ready-to-use pulp: It can be sprayed using the designated supporting airless sprayer, without the need to add water for dilution, thus reducing paint dispersion and increasing utilization rate.
Application instructions: The surface must be clean, dry, neutral, flat, and free of floating ash, oil stains and foreign substances. Water-leaking positions must undergo waterproof treatment. Before coating, the surface should be polished and leveled to ensure that the surface humidity of the pre-coated substrate is <10% and the pH value is<10.
Application conditions: Wall temperature ≥ 5 ℃, humidity ≤ 85%, well-ventilated.
Application method: Brushing, rolling, or spraying; it is recommended to use the designated supporting airless sprayer to apply the original pulp.
Dilution ratio: Dilute with clean water and mix evenly. It is recommended that the dilution ratio should not exceed 20% (weight ratio); when the original pulp is used for spraying, there is no need to dilute. (Dilution is not recommended, if necessary, a small amount of water may be used to dilute to the appropriate viscosity)
Theoretical paint consumption: 12-14m2/L/one round (rolling) (paint film is calculated as 30μm, and actual consumption varies slightly with substrate roughness and porosity).
Recoating time: Surface drying 30-60 minutes, recoating interval 2-3 hours (which may be duly extended under low-temperature and high-humidity conditions).
Maintenance time: 7 days / 25℃, which may be duly extended under low-temperature (not less than 5℃), high-humidity conditions to obtain a solid film effect. In the process of paint film maintenance and daily use, it is suggested that doors and windows should be closed for dehumidification in high humidity weather (such as Wet Spring and Plum Rain).
Substrate Treatment:
New wall: Thoroughly remove surface dust, oil stains, loose plaster, etc., and repair any holes to ensure that the wall surface is clean, dry and smooth.
Re-painting wall: Thoroughly remove the original paint film and putty layer, clean surface dust, and level, polish, clean and thoroughly dry the surface, so as to avoid problems left over from the old wall (odor, mildew, etc.) affecting the application effect.
*Before coating, the substrate should be checked; coating can only start after the substrate passes acceptance inspection.
Coating System:
Substrate treatment (3TREES substrate treatment product series) – primer (High Performance One Coat Wall Paint) – apply 1-2 rounds
Tool Cleaning:
After or between applications, please clean the tools with clean water in time in order to prolong tool life.
The packaging bucket can be recycled after cleaning, and packaging waste may be recycled for reuse.
This product should be sealed and stored at 0-40℃ in a cool and dry place and away from exposure to the sun.
Refer to the product label for production date, batch number and expiration date.
For product application tips, please refer to the safety label on product packaging.
Since its establishment, our factory has been developing first world class products with adhering the principle
of quality first. Our products have gained excellent reputation in the industry and valuabletrusty among new and old customers..