Intelligent Hydraulic Fixed Winch Hoist /Hydropower Station Fixed Winch Hoist

Short Description:

The intelligent fixed winch hoist is specially used to hoist the sluice gate, trash rack and other equipment in hydropower station, hydro-junction and navigation junction. It is an important part of hydraulic machinery.


Product Detail

Product Tags

The intelligent fixed winch hoist is specially used to hoist the sluice gate, trash rack and other equipment in hydropower station, hydro-junction and navigation junction. It is an important part of hydraulic machinery.

In addition to the hoisting function of normal fixed hoist hoist, the intelligent fixed hoist hoist also has a safety monitoring system, online monitoring system and automatic operation system. The internal state and external operation of the equipment can be clearly seen in the central control room and mobile communication equipment. At the same time, when the monitoring data is close to the set limit value, the system will send alarm signals to the central control room and mobile communication equipment; When the set limit value is reached, the power supply will be cut off automatically, and the fault cause signal will be sent.

We have successfully supplied and installed many fixed winch hoist to the customers at home and aboard. The max. capacity of the fixed winch hoist we have manufactured and installed till now is 2×3600kN-35m (double lifting point), for Dongzhuang Hydro-junction Project, and 1×5000kN-85m (single lifting point), for Dashimen Hydro-junction Project.

The Followings Are Some Of Our Successful Project Cases

No.

Project Name

Customer

Main technical data

Qty.

1

Dongzhuang Hydro-junction Project

Shanxi Dongzhuang Hydro-junction Project Construction Co., Ltd.

2×3600kN-35m

2 sets

2

Wusu Sikeshu Jielgede Hydro-junction Project

Wusu Sikeshu Jielgede Hydro-junction Project Construction Administration Bureau

 QP1×2000kN-65m

1 set

3

Tuxikou Reservoir

Sichuan Tuxikou Reservoir Construction Administration Bureau

2×2500kN-26m

2 sets

4

Shimen Reservoir

Shanxi Hanzhong Shimen Reservoir Reinforcement Project Office

 2×1000kN-29m

6 sets

 1250kN-67m

1 set

 2500kN-59m

1 set

 2500kN-64m

1 set

5

Huangjiawan Hydro-junction Project

Guizhou Water Conservancy Investment (Group) Co. Ltd.

 2500kN-41m

1 set

6

Vietnam YEN SON Hydropower Station

Power China Guiyang Survey and Design Institute Co. Ltd.

2×1250kN-27m

9 sets

2×1000kN-27m

3sets

7

Huilongshan Hydropower Station

Yunnan China Resources Electric Power (Xishuangbanna) Co. Ltd.

2000kN-60m

1 set

8

Dashimen Hydro-junction Project

Dashimen Reservoir Management Office of Bayingoleng Mongolian Autonomous Prefecture

QP2×2500kN-20m

1 set

QP1×5000kN-85m

1 set

QP2×2500kN-70m

1 set

QP2×630kN-15m

1 set

9

Guizhou Jiayan Hydro-junction and northwest Guizhou Water supply Project

Guizhou Water Conservancy Investment (Group) Co. Ltd.

5000kN-70m

1 set

2×2000kN-15m

1 set

 4000kN-15m

1 set

2×800kN-36m

1 set

10

Tongnan Navigation Power Junction Project

Chongqing Navigation Construction Development Co. Ltd.

2×1000kN

18 sets

2×1600kN

3 sets