The 3TREES (New) Odorless 2-in-1 Wall Paint is an interior wall emulsion paint adopting an odorless and no-additive formula. The product is made from superior raw materials, using advanced technology. It possesses excellent hiding power and strong alkali resistance, and can create a fresh and natural home environment or you. The product has passed UL GREENGUARD Gold Certification and French Indoor Air Emissions A+ Certification and meets the more stringent Health+ Water-Based Coating Standard, thus providing better home protection.
Super Healthy, Super Caring
3TREES Health+ Water-Based Coating Standard
UL GREENGUARD Gold Certification
French Indoor Air Emissions A+ Certification
China Environmental Labelling Product Certification
Highly efficient, odorless
Practical Functions, Comprehensive Protection
Strong resistance to alkali
Excellent hiding power
Easier application
Main ingredients: Water, pigment, filler, emulsion and auxiliaries.
Product use: It is widely used in the interior wall decoration and protection of villas, hotels, hospitals, schools, office buildings and homes.
Application instructions: The surface must be clean, dry, neutral, flat, and free of floating ash, oil stains and foreign substances. Water-leaking positions must undergo waterproof treatment. Before coating, the surface should be polished and leveled to ensure that the surface humidity of the pre-coated substrate is <10% and the pH value is <10. Paint surface effect will depend on substrate flatness.
Application conditions: Wall temperature ≥ 5 ℃, humidity ≤ 85%, well-ventilated.
Application method: Brushing, rolling, or spraying.
Dilution ratio: Dilute with clean water. It is recommended that the dilution ratio should not exceed 20% (weight ratio).
Theoretical paint consumption: 12-14m2/L/round (paint film is calculated as 30μm, and actual consumption varies slightly with substrate roughness and porosity).
Recoating time: Surface drying 30-60 minutes, recoating interval 2-3 hours (which may be duly extended under low-temperature and high-humidity conditions).
Maintenance time: 7 days / 25℃, which may be duly extended under low-temperature, high-humidity conditions to obtain a solid film effect. In the process of paint film maintenance and daily use, it is suggested that doors and windows should be closed for dehumidification in high humidity weather (such as Wet Spring and Plum Rain).
Substrate Treatment:
New wall: Thoroughly remove surface dust, oil stains, loose plaster, etc., and repair any holes to ensure that the wall surface is clean, dry and smooth.
Re-painting wall: Thoroughly remove the original paint film and putty layer, clean surface dust, and level, polish, clean and thoroughly dry the surface, so as to avoid problems left over from the old wall (odor, mildew, etc.) affecting the application effect.
*Before coating, the substrate should be checked; coating can only start after the substrate passes acceptance inspection.
Coating System:
For best effect, please use this product together with 3TREES primer.
Substrate treatment (3TREES substrate treatment product series) – primer – apply 1 round – topcoat– apply 2 rounds
Tool cleaning: After or between applications, please clean the tools with clean water in time in order to prolong tool life. The packaging bucket can be recycled after cleaning, and packaging waste may be recycled for reuse.
This product should be sealed and stored at 0-40℃ in a cool and dry place and away from exposure to the sun.
Refer to the product label for production date, batch number and expiration date.
For more information, please refer to the product safety label.
Since its establishment, our factory has been developing first world class products with adhering the principle
of quality first. Our products have gained excellent reputation in the industry and valuabletrusty among new and old customers..