Possessing the characteristics of alkali resistance, excellent application, good adhesion, outstanding whiteness and home beautification, the 3TREES Superior Home Clean Wall Paint is an economical decorative coating, suitable for interior wall and ceiling painting.
It is widely used in the interior wall decoration and protection of villas, hotels, hospitals, schools, office buildings and homes.
Main ingredients: Water, pigment, filler, emulsion and auxiliaries.
Odorless and environmental-friendly
Alkali resistance
Excellent whiteness
Good adhesion
Easy application
Application instructions: The surface must be clean, dry, neutral, flat, and free of floating ash, oil stains and foreign substances. Water-leaking positions must undergo waterproof treatment. Before coating, the surface should be polished and leveled to ensure that the surface humidity of the pre-coated substrate is <10% and the pH value is <10. Paint surface effect will depend on substrate flatness.
Application conditions: Wall temperature ≥ 5℃, humidity ≤ 85%, well-ventilated.
Application method: Brushing, rolling, or spraying.
Dilution ratio: Dilute with clean water and mix evenly. Specific dilution ration may be determined based on weather, substrate, application method and other conditions.
Theoretical paint consumption: 12-14m2/L/round (paint film is calculated as 30μm, and actual consumption varies slightly with substrate roughness and porosity).
Recoating time: Surface drying 30-60 minutes, hard drying 2 hours, and recoating interval 2-3 hours (which may be duly extended under low-temperature and high-humidity conditions).
Maintenance time: 7 days / 25℃, which may be duly extended under low-temperature, high-humidity conditions to obtain a solid film effect. In the process of paint film maintenance and daily use, it is suggested that doors and windows should be closed for dehumidification in high humidity weather (such as Wet Spring and Plum Rain).
Coating System:
For best effect, please use this product together with 3TREES primer.
Substrate treatment (3TREES substrate treatment product series) – primer (apply 1 round) – topcoat (apply 2 rounds)
Tool cleaning: After or between applications, please clean the tools with clean water in time so as to prolong tool life.
The product should be sealed and stored at 0-40℃ in a cool and dry place and away from exposure to the sun.
Since its establishment, our factory has been developing first world class products with adhering the principle
of quality first. Our products have gained excellent reputation in the industry and valuabletrusty among new and old customers..